Indoor pool refurbishment – Ascot , Berkshire
Renovation of a 30 year old Indoor pool complex
This project involved :
-
Installation of a Calorex Variheat 1200 EC unit which heats the pool water and pool hall air and also de-humidifies the air by the use of integral heat pump
-
The plant room was completely rewired by us to meet current standards
- New ductwork was fabricated and fitted by us.
-
Whilst working on site the customer asked us to install a new 2 metre round acrylic spa in an aperture that previously held a spa but which has been removed by the previous owner
-
New spa skid pack was installed in the plant room this comprised a filter, heater, blower and underwater lights
-
2 New LED underwater lights were installed in the pool to replace the old tungsten units
-
A new exterior oil boiler was also installed by us to provide the hot water to heat the pool, the pool room hall and changing room
Renovation of a 30 year old Indoor pool complex
This project involved :
-
Installation of a Calorex Variheat 1200 EC unit which heats the pool water and pool hall air and also de-humidifies the air by the use of integral heat pump
-
The plant room was completely rewired by us to meet current standards
- New ductwork was fabricated and fitted by us.
-
Whilst working on site the customer asked us to install a new 2 metre round acrylic spa in an aperture that previously held a spa but which has been removed by the previous owner
-
New spa skid pack was installed in the plant room this comprised a filter, heater, blower and underwater lights
-
2 New LED underwater lights were installed in the pool to replace the old tungsten units
-
A new exterior oil boiler was also installed by us to provide the hot water to heat the pool, the pool room hall and changing room