New liner pool with automatic safety cover – Arborfield , Berkshire
New liner pool construction by Ascot Swimming Pools – Project duration 8 weeks
- 4.5m x 12m, constant depth 1.40m
- Indian sandstone surround to form pool edge
- Walls constructed form dense solid concrete blocks
- Corner entry steps with factory liner shaped to conform to step profile
- Calorex air to water heat pump
- Safety cover in grey with underground cover chamber with Oak lid
This new pool was constructed by us as part of a complete redevelopment of the rear garden which included the conversion of an existing farm building into a relaxation area.
The excavated spoil from the pool was deposited in an adjacent field and then tracked down to form a new paddock with separate entrance.
New liner pool construction by Ascot Swimming Pools – Project duration 8 weeks
- 4.5m x 12m, constant depth 1.40m
- Indian sandstone surround to form pool edge
- Walls constructed form dense solid concrete blocks
- Corner entry steps with factory liner shaped to conform to step profile
- Calorex air to water heat pump
- Safety cover in grey with underground cover chamber with Oak lid
This new pool was constructed by us as part of a complete redevelopment of the rear garden which included the conversion of an existing farm building into a relaxation area.
The excavated spoil from the pool was deposited in an adjacent field and then tracked down to form a new paddock with separate entrance.