Depth reduction, renovation and safety cover fitted – Chobham , Surrey

Depth reduction, retiling of pool and  safety cover fitted

 This project involved –
  • Draining the pool, pressure washing and then acid washing the pool interior
  • Reducing the depth of the pool from 2.50m to 1.75m
  • Rendering the new pool floor
  • Making good the entry steps and repairing damaged parts of the pool shell
  • Tiling the whole of the interior of the pool
  • Making good the brick surround
  • Replacing all the old pool pipework
  • Installing new skimmer, return inlets, main drains automatic top up, and LED underwater light
  • Fitting new filtration and heating
  • Installing new electrical circuit
  • Connecting new water, gas and electrical service to new plant room
  • Fitting new safety cover within oak box and surface mounted operating tracks